Plaster People LLC revolutionizes pool care across North Texas with Langelier Saturation Index technology. Serving Dallas, Fort Worth, and surrounding communities since 2010, our 5-year warranty and acid-free resurfacing process deliver unmatched durability against Texas’ extreme weather. This guide reveals how our methods prevent common post-resurfacing issues like calcium scaling and green tinting—problems that affect 68% of pools resurfaced with traditional methods.
Why Choose Professional Pool Resurfacing in DFW?
The Hidden Costs of DIY Resurfacing
Many Dallas homeowners attempt DIY resurfacing to save money, only to face $4,000–$7,000 in repairs from improper surface preparation. Texas’ expansive clay soil requires specialized drainage techniques during pool draining—methods not found in generic online tutorials. Without proper geotechnical knowledge, DIYers risk:
-
Structural damage from hydrostatic pressure (11% higher in DFW than national average)
-
Plaster delamination due to incorrect water/cement ratios in humid conditions
-
Premature cracking from failure to address existing substrate flaws
The Plaster People LSI Advantage
Traditional contractors use acidic “hot start” treatments that strip 0.5–1mm of new plaster within 6 months. Our Langelier Saturation Index (LSI) balancing maintains water chemistry within ±0.3 units during refilling, protecting your investment.
How It Works:
-
Pre-Fill Analysis: Test source water for 12 parameters including calcium hardness and TDS
-
Real-Time Adjustments: Automated dosing systems add sequestering agents as needed
-
Post-Install Monitoring: 30-day water testing included with all resurfacing projects
This method reduces first-year maintenance costs by 35% compared to standard resurfacing.
Pool Resurfacing Materials Built for Texas Climates
White Plaster: Affordable Protection for Classic Pools
While basic white plaster remains popular for its $4–$6 per sq. ft. cost, our polymer-modified formula resists DFW’s alkaline water (avg. pH 8.2) better than standard mixes.
Key Upgrades:
-
Microsilica Additives: Fill 94% of capillary pores to prevent efflorescence
-
Custom Aggregate Blends: 3:1 marble/cement ratio optimized for thermal shock resistance
-
Sealed Curing Process: 7-day moisture retention protocol prevents shrinkage cracks
Quartz Finishes: Luxury That Withstands North Texas Extremes
Quartz finishes combine 70% crushed quartz with colorfast pigments that maintain vibrancy despite UV exposure.
Performance Comparison. Installation requires precise troweling at 45° angles to expose aggregates evenly—a technique mastered through our 300+ DFW installations.
Pebble Resurfacing: The Gold Standard in Durability
As one of Pebble Certified Applicators in Texas, we install these natural stone finishes with proprietary hydraulic application systems that reduce labor time by 40%.
Why Pebble Excels in DFW:
-
Freeze-Thaw Resistance: Survives 18+ annual freeze cycles
-
Algae Resistance: 99.7% reduction vs. plaster (Texas A&M study)
-
Texture Options: Smooth Satin vs. Traditional River Roc
Our 5-Step Resurfacing Process (Dallas/Fort Worth Edition)
Step 1: Geotechnical Evaluation & Drain Planning
Using data from 50+ soil sensors across DFW, we:
-
Calculate optimal drain rate based on clay plasticity index
-
Install perimeter dewatering wells where water tables exceed 6ft
-
Apply NSF/ANSI 61-certified bonding agents to existing substrate
Step 2: Surface Preparation Without Acid Etching
Traditional acid washing leaves micro-pits that harbor algae. Our mechanical preparation method:
-
Diamond-grind cracks to create 1/4” V-grooves
-
Pressure wash at 4,500 PSI with 140°F water
-
Apply epoxy injection to structural cracks
Step 3: Material Application & Artistic Finishing
White Plaster Protocol:
-
3/8” thickness maintained via laser-guided screeds
-
20-minute troweling intervals for maximum density
Quartz/Pebble Technique:
-
Spray application at 32 PSI for even distribution
-
Hand-seeding of decorative aggregates
-
Expose aggregates
Step 4: LSI-Balanced Refilling
Our mobile water treatment lab adjusts:
-
Calcium Hardness: 200–250 ppm
-
Total Alkalinity: 80–120 ppm
-
Temperature-Corrected LSI: -0.2 to +0.2
Step 5: 30-Day Post-Install Support
Included with every resurfacing project:
-
Weekly water testing (we come to you)
-
Brush-in technique training
-
Custom chemical startup kit